Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

alert('Error in the data table'); "); if(mysql_num_rows($result2) > 0 ) $ex2 = mysql_fetch_array($result2); print $ex2[1]; ?>
  
Search

• By type of industry




• By name of factory

 

• By material

 



Jubail II Industrial City



$3.8 billion is the estimated cost to create all necessary infrastructure facilities including roads, utilities, cooling, water, wastewater and the required pipeline corridor to complete a successful industrial park. But that's not all, at least $18 billion dollars are being designed to build the industrial city, extending from the existing industrial park to Kuwait-Ras Tanura corridor. Jubail industrial park will be developed in four stages, and up to 50,000 residential units will be added by 2026. The RCJY has asked Bechtel, which handled Jubail 1, to manage Jubail II.
 Location
 Number of factories
 Number of employees
 Total Area (m²)

saudiindustri © , design and idea by emarapolis / naba-ad